Get a quotation

Let us quote for the airconditioning / refrigeration you require. Our quotes are usually returned within 2 hours. Please fill out the below form and someone will be in touch shortly.

 
 
 
 
Or contact us

Tel: 01707 852165
Mobile: 07802 895281
Email: sales@ccphvac.co.uk

CCP HVAC Limited
3 Station Close, Potters Bar,
Hertfordshire, EN6 1TL
 
 
Let's Talk

If you would like to book a free no obligation consultation, enquire about our services or simply request a call back, simply fill in the short form below.

 
 
Or just drop us a line
 
 
 
 
Tel: 01707 852165
Mobile:07802 895281
Email: sales@ccphvac.co.uk

CCP HVAC Limited
3 Station Close, Potters Bar,
Hertfordshire, EN6 1TL
 

Case Study

 

Future-Proof Food Refrigeration Plant - Greenford

An Energy Saving System Designed & Built In Record Time

 

An Energy Saving System Designed & Built In Record Time

The Problem

For over two decades Gradegold Limited has been a market leader in providing premium goods, delivering prepared fruit and vegetable products to many food-manufacturing industries. GradeGold recently won a contract to supply their products to Gate Gourmet, a leading supplier to the airline industry. Gradegold realised that their existing production facility in Southall was too small for the volume of future business. A new site was found nearby in Greenford. The new 15,000 sq/ft site was ideal for their expansion plans, however Gradegold now needed to source a contractor who could build a production facility comprising of several refrigerated rooms in just twelve weeks.

The Solution

Gradegold spoke with an existing CCP HVAC client who recommended that they liaise with CCP HVAC about the project, having themselves been very satisfied with the work carried out. CCP HVAC were asked to design and build a state of the art refrigerated production facility within a specified budget and to a strict timeframe. Incorporating the latest energy efficient plant, the design had to be future-proof and resourceful. Sanjai Talsania, technical director at CCP HVAC, set about gathering information based on what the customer had asked for and designed a system.

The project needed to be completed and ready within twelve weeks, so that the food production process could begin.

Follow up

CCP HVAC finished the project in record time and on budget. Due to design specification made by CCP HVAC which incorporated an energy efficient refrigeration plant, EC rated fans and LED lighting, the projected savings are 20% per annum.

The site has now been operational for nine months, and not a single breakdown has occurred. The facility continues to fulfil the needs of Gradegold, and plans are in place to do similar works at the nearby Southall facility.

For expert help and advice on air-conditioning, heating and refrigeration call us now on 01707 852165

Future-Proof Food Refrigeration Plant - Greenford
 
 
What our clients say
 
Anand Halai, Director at Gradgold says,
 

We are delighted we chose CCP HVAC as they have delivered the project on time and on budget.

Email

Please email us at sales@ccphvac.co.uk with your name and contact number.

Call us

Why not give us a call on
Tel: 01707 852165

Write to us

CCP HVAC Limited
3 Station Close
Potters Bar
Hertfordshire
EN6 1TL